Crews are inspecting retractable bollards installed at Broadway and Rep. John Lewis Way downtown before the next round of concrete work, WSMV reports. The pilot project is meant to make it easier to close the area to cars during events and busy pedestrian times. NDOT has said construction should wrap up by December 4, weather permitting.
Source: WSMV
Original Story
Questions We Have: If the pilot works, where else downtown could the city add bollards next?

